For plant EHS teams

EHS, verified
line by line.

Clear safety data leadership can act on, procedures off paper, and written programs done for you.

Example SIF rate card: 0.12 per 200,000 hours, down 61%, under the 0.15 target
Example card: 14 open corrective actions, down 6 since September

Illustrative only · not a real customer

What we do

Three ways we help.

Start with one. Most plants start with the dashboard.

  1. 01 / 03
    Dashboards & reports

    See it all at a glance.

    SIF rate, corrective actions, training and inspections on one page, in reports leadership actually reads.

    Example SIF rate dashboard card: 0.12 per 200,000 hours, under the 0.15 target
  2. 02 / 03
    Paper to digital

    Get procedures off the shelf.

    Binders, logs and old procedures become one current, searchable, verified list for every machine.

    Example list of energy-control procedures: 24 machines, 23 verified
  3. 03 / 03
    Done-for-you programs

    Programs written for you.

    We write, update and review the OSHA programs your plant needs, and close the gaps when AI alone isn't enough.

    Lockout / tagout program
    29 CFR 1910.147
    • Written programCurrent · Rev 3
    • Annual periodic inspectionDone · Sep 2026
    • Authorized employee trainingRecords on file
Interactive sample dashboard

Try it. Every number is made up.

Pick a plant, a time range, or a metric. This is the kind of view we build from your own data.

Fictional plants in Birmingham, Memphis and Chattanooga. Illustrative only · not a real customer.

Open full sample

Fictional plants in Birmingham, Memphis and Chattanooga, made-up numbers. Illustrative only · not a real customer, not read from any database. Try the controls.

Company-wide safety dashboard

Birmingham + Memphis + Chattanooga rolled up · as of Oct 24, 2026

Key metrics · Company-wide

Pick a metric to update the chart and the list below it.

Company rollup · SIF rate

Hours-weighted across all 3 plants. Showing Company-wide. Pick a tile to switch.

SIF rate · Company-wide · last 90 days

Hover or tap the chart for values. Per 200,000 hours, avg over range.

  • Company-wide
  • Birmingham
  • Memphis
  • Chattanooga

SIF and SIF-potential events

5 items · Company-wide · last 90 days

  • Guard removed for cleaning, not re-installed (SIF potential)
    EV-11Oct 15Memphis · Production
    Investigation open
  • Dock plate dropped with forklift on it (SIF potential)
    EV-17Oct 6Chattanooga · Shipping
    Investigation open
  • Stored pressure released during valve swap (SIF potential)
    EV-10Sep 29Birmingham · Maintenance
    Investigated, actions assigned
  • Rack overload at end of aisle 3 (SIF potential)
    EV-16Sep 8Memphis · Warehouse
    Investigated, actions assigned
  • Pedestrian in forklift lane at shift change (SIF potential)
    EV-09Aug 12Memphis · Shipping
    Investigated, actions assigned

Program requirements

27 of 36 meet · Company-wide · as of Oct 24, 2026

  • Permit-required confined spaces: Rescue and emergency services arranged and evaluated
    29 CFR 1910.146(d)(9)Birmingham plantRescue team not evaluated in the last 12 months
    Fix firstGap
  • Permit-required confined spaces: Rescue and emergency services arranged and evaluated
    29 CFR 1910.146(d)(9)Memphis plantNo rescue plan on file for the pit sump
    Fix firstGap
  • Lockout/Tagout: Group lockout procedure
    29 CFR 1910.147(f)(3)Birmingham plantNo written group lockout steps for shift changes
    Gap
  • Hazard communication: Workplace labels on secondary containers
    29 CFR 1910.1200(f)(6)Birmingham plantPaint-area spray bottles unlabeled
    Gap
  • Lockout/Tagout: Annual periodic inspection of each procedure
    29 CFR 1910.147(c)(6)Memphis plant2 of 31 procedures missed their annual inspection
    Gap
  • Powered industrial trucks: Operator evaluation at least every 3 years
    29 CFR 1910.178(l)(4)Memphis plant6 operators past their 3-year evaluation
    Gap
  • Permit-required confined spaces: Entrant, attendant and supervisor training
    29 CFR 1910.146(g)Memphis plantAttendant training not documented for 2nd shift
    Gap
  • Hazard communication: Workplace labels on secondary containers
    29 CFR 1910.1200(f)(6)Memphis plantSecondary containers unlabeled in 2 areas
    Gap
  • Powered industrial trucks: Pre-shift truck examination
    29 CFR 1910.178(q)(7)Chattanooga plantPre-shift truck checklists missing on 3rd shift
    Gap

Fictional plants in Birmingham, Memphis and Chattanooga. Illustrative only · not a real customer. Sample data for demonstration.

Paper to digital

From a shelf of binders to one list you can trust.

We gather every energy-control procedure, check each revision, and hand back a current list for every machine.

Before: a stack of paper binders with old copies, unknown revisions and missing machines. After: an example digital list of energy-control procedures, 24 machines with 23 verified and one review due. Example data.
Illustrative only · not a real customer
How it works

Four steps, no software to install.

  1. 1

    Book a 30-minute call

    Tell us what you track today and what leadership keeps asking for.

  2. 2

    Send what you have

    Spreadsheets, logs, binders, old procedures. Paper is fine.

  3. 3

    We build it

    Your dashboard, your digital procedure list, and a clear list of program gaps.

  4. 4

    We close the gaps

    Written programs done for you, reviewed by a working EHS practitioner.

Not sure where your gaps are?

Start with a free program screening or the LOTO scorecard. A starting point, not the whole offer.

Book an appointment

Talk it through in 30 minutes.

Dashboards, paper to digital, or a program that needs writing. No pitch deck.

Pick a time

Loading open times…

Or call (229) 451-3448

Get started

Tell us what needs verifying

A 30-minute conversation is enough to scope most engagements. No pitch deck, no pressure — just an honest read on where your program stands.

base44
Edit with Base44